Determination of flexibility of workers working time through Taguchi method approach
Suhaila Saidat, Ahmad Kadri Junoh, Wan Zuki Azman Wan Muhamad, Zainab Yahya
Abstract
Human factor is one of the important elements in manufacturing world, despite their important role in improvement the production flow, they have been neglected while scheduling for many decades. In this paper the researchers taken the human factor throughout their job performance weightage into consideration while using job shop scheduling (JSS) for a factory of glass industry, in order to improving the workers' flexibility. In other hand, the researchers suggested a new sequence of workers' weightage by using Taguchi method, which present the best flexibility that workers can have, while decreasing the total time that the factory need to complete the whole production flow.
Keywords
human factors; job shop scheduling; signal to noise; Taguchi method;
DOI:
http://doi.org/10.12928/telkomnika.v18i5.13979
Refbacks
There are currently no refbacks.
This work is licensed under a
Creative Commons Attribution-ShareAlike 4.0 International License .
TELKOMNIKA Telecommunication, Computing, Electronics and Control ISSN: 1693-6930, e-ISSN: 2302-9293Universitas Ahmad Dahlan , 4th Campus Jl. Ringroad Selatan, Kragilan, Tamanan, Banguntapan, Bantul, Yogyakarta, Indonesia 55191 Phone: +62 (274) 563515, 511830, 379418, 371120 Fax: +62 274 564604
<div class="statcounter"><a title="Web Analytics" href="http://statcounter.com/" target="_blank"><img class="statcounter" src="//c.statcounter.com/10241713/0/0b6069be/0/" alt="Web Analytics"></a></div> View TELKOMNIKA Stats