A progressive domain expansion method for solving optimal control problem

Olalekan Ogunbiyi, Oludare Y. Ogundepo, Madugu I. Sani, Cornelius Thomas, Benjamin J. Olufeagba

Abstract


Electricity generation at the hydropower stations in Nigeria has been below the expected value. While the hydro stations have a capacity to generate up to 2,380 MW, the daily average energy generated in 2017 was estimated at around 846 MW. A factor responsible for this is the lack of a proper control system to manage the transfer of resources between the cascaded Kainji-Jebba Hydropower stations operating in tandem. This paper addressed the optimal regulation of the operating head of the Jebba hydropower reservoir in the presence of system constraints, flow requirement and environmental factors that are weather-related. The resulting two-point boundary value problem was solved using the progressive expansion of domain technique as against the shooting or multiple shooting techniques. The results provide the optimal inflow required to keep the operating head of the Jebba reservoir at a nominal level, hence ensuring that the maximum number of turbo-alternator units are operated.

Keywords


constraints, inflow; optimal control; operating head; Pontryagin

Full Text:

PDF


DOI: http://doi.org/10.12928/telkomnika.v18i4.15047

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

TELKOMNIKA Telecommunication, Computing, Electronics and Control
ISSN: 1693-6930, e-ISSN: 2302-9293
Universitas Ahmad Dahlan, 4th Campus
Jl. Ringroad Selatan, Kragilan, Tamanan, Banguntapan, Bantul, Yogyakarta, Indonesia 55191
Phone: +62 (274) 563515, 511830, 379418, 371120
Fax: +62 274 564604

View TELKOMNIKA Stats